Operation and Maintenance of a potable water supply system with a capacity of 70,000 m3/day for Tripoli covering:
HAB Water treatment plant 40,000 m3/day with coagulation, flocculation, sedimentation with Aluminum sulfate / Ferric chloride / Lime / GAC dosing, gravity and filters pre and post chlorination with residual auto control, SCADA System.
ABU HALQA pumping station 30,000 m3/day with stainless steel submersible forwarding sets and inline submersible booster pumping sets, SCADA system.